YouTube
Instagram
  1. Home
  2. Building Services
  3. Civil Case Study: Wastewater Pumpstation for 150 Lots

Civil Case Study: Wastewater Pumpstation for 150 Lots

West Hills Civil Case Study
Application

This project required a wastewater pumpstation for 150 lots in Massey, Auckland.

The pumpstation needed to be designed to the Watercare DP-06 wastewater pumpstation design standard, as it was to be a public asset.

Solution

Our team designed up this wastewater pumpstation to meet the needs & requirements from Watercare, identifying the storage requirement of 33.75m3.

This pumpstation had a wetwell 3.0m dia x 7.8m deep, the pumps were Sulzer 7.0kW with a flow rate of 8.5 l/sec.

We were involved in this project from concept design through to the commissioning and writing the Operations & Maintenance manual (500+ pages).

Products Used
Menu