YouTube
Instagram

CASE STUDIES

NZDF Site Puraceptors New Zealand

NZDF Runway Upgrade: Puraceptor P250

This project required the collection and oil/water separation from a runway on a NZDF site. The area needed to collect all liquid with no by-pass operation with the flowrate from the catchment area at 500lps.

Read More
Menu