Civil Case Study: Auranga Stage 1 Wastewater Pumpstation

Auranga Stage 1 WWPS
Wastewater Pumpstation
Application

This pumpstation was manufactured & assembled by our company and is capable of pumping the wastewater from a new large residential development in Drury (South Auckland), as well as taking the pumped flow from Drury South.

Solution

Our team worked with GHD Consultants with the design of this pumpstation; the wetwell and integral valve chamber were manufactured from fibreglass and all pipework was pre-fitted in the factory before being delivered to site ready for the civil contractor to lower into the ground.

Wetwell size: 3.5m dia x 8.93m deep

Pumps: Xylem NP3153 13.5kW

Pipework: 150mm 316 Stainless Steel