Okura River Rd
Okura River Rd
Taking wastewater from 60 Houses
84.2m static head and 1220m long rising main
We designed and supplied a four pump system which was made up of two 5.5kW submersible grinder pumps feeding into two 11kW helical rotor pumps.
Chamber size: 2.5m dia x 4.5m deep with 3.0 x 3.2m dry box on top to house the PC pumps.
As this station is deep in a valley, it required a ‘store & forward’ radio transmission system. This was designed to Watercare Services standards and the project was commissioned and completed to their satisfaction.