Site
Grove Rd, Takanini
Application
Taking wastewater from 135 Houses for the initial stage and is upgradable for up to 1800 houses to cater for the surrounding area.
This has a very flat head but 750m long rising main.
Solution
We designed this pumpstation so in the future the pumpstation could be very easily upgraded from 7.4kW pumps to 47kW pumps. The pipework in the valve chamber is 200mm although the initial rising main is only 125OD.
Chamber size: 2.5m dia x 7.58m deep
This was designed to Veolia Water standards and was installed and commissioned and handed over to them as a working system.