A large concrete products manufacturing site in Auckland were having issues with the pumps pumping waste water from their settlement pond. Mechanical seals would fail regularly from being dry run and – if the dry running did not wreck them – the fine cement particles in the waste water would. Typical mean time between services was 6 months or less.